This blog started as a photo journal of the construction progress of our" little cabin in the woods" Contractor: Mike Kennedy, Hazel Green, Al. Construction began 12/7/2009 move in date: March 14, 2010 For many years Bob had wanted a "little cabin in the woods"..the construction of his cabin was completed just one month before he died. I deeply regret that he never got to enjoy living here.
Mar 31, 2010
Mar 12, 2010
Ready To Move In
The house passed inspection this morning and Huntsville Utilities came out this afternoon and hooked up water and electricity.
Our boys from Texas will be here this weekend so I will put them to work moving our furniture in...'not looking forward to having the place cluttered up with boxes...
The first night-time pictures ...
Laura Leigh and Jason are going to be in charge of hanging the blinds for us...white, wooden blinds...
Mar 10, 2010
Mar 4, 2010
Last Weeks Activity on Peete's Landing
cleanup and leveling of yard


bedroom carpet delivered and installed
kitchen appliances delivered
seeding of yard
Mike...the general contractor
Yesterday the bathroom tile was laid. Everything is suppose to be completed this week but still to be done:
bathroom and kitchen fixtures to be installed, some light fixtures to be hung, closet shelving, front porch and handicap ramp to be completed.
Feb 24, 2010
We Have Kitchen Cabinets !!!
The cooktop will be installed in this island after the appliances (black) are delivered ...
Pay no attention to that green wall in the background....mistake...it will be painted another color...probably the same brown as the other walls or a lighter (or darker?) shade of it
porch still in progress.but the ceiling fans have been hung..
Barb wrote scriptures on the sub-flooring....floors will be installed tomorrow or Friday...
Feb 18, 2010
Getting Close...two more weeks (maybe)
Until this last week most of Feb. was too wet and muddy for work to be done.
The painters started inside on Monday and finished today.
Yesterday the septic tank location was dug, placed, approved and covered up!
Also, the ditch was dug to lay the power and water lines...all the way up the side of Barb's yard to the street.
Next week the electricial lights will be installed and following that, the kitchen cabinets and floors will be laid.
They've got to finish the porch (railing and screen) and build the handicap ramp.
The painters started inside on Monday and finished today.
Yesterday the septic tank location was dug, placed, approved and covered up!
Also, the ditch was dug to lay the power and water lines...all the way up the side of Barb's yard to the street.
Next week the electricial lights will be installed and following that, the kitchen cabinets and floors will be laid.
They've got to finish the porch (railing and screen) and build the handicap ramp.
Feb 3, 2010
Jan 29, 2010
The sheetrock has all been hung, taped and mudded once..when it drys it will be sanded, mudded again, dried once more, sanded once more...then I believe it's ready for painting..
This is the "kitchen end" of the great room...'will have a cooktop island
Our Bedroom view...and our beautiful Barbara
The view from our house
isn't it beautiful :)
Jan 27, 2010
Monday Barb and I chose the plumbing fixtures...today we decided on the floors...
She preferred hardwood, as shown below on left...Bob and I prefered the wider plank, less textured ? selection on the right....it is not hardwood but its what she has in her shop and looks very pretty, wares well and is 50cents a sq.ft. cheaper than real wood...
The carpet shown is what we're going to use in the bedroom.
This is the third day of work on the siding...
She preferred hardwood, as shown below on left...Bob and I prefered the wider plank, less textured ? selection on the right....it is not hardwood but its what she has in her shop and looks very pretty, wares well and is 50cents a sq.ft. cheaper than real wood...
The carpet shown is what we're going to use in the bedroom.
This is the third day of work on the siding...
Jan 21, 2010
Jan 19, 2010
Progress Report...
'Finally got a break from the bad weather .... a bit more work completed ...plumbing and electrical roughed in, roofing, windows and outside doors...If there are no delays in materials should be another 4 to 6 weeks before completion. We're waiting for another bid on cabinets...the first one was way over budget.
Jan 10, 2010
Jan 5, 2010